Service Details:
Minimum Order Quantity | 1 Manday |
Type Of Energy | Electrical |
Reason For Audit | All |
Type Of Load | All |
Type Of Service Provider | Auditor |
Usage/Application | Industrial |
Phase Type | All Phase |
Power Rating | 11 to 22 kVA |
Load Type | All |
Construction Type | Both |
Application Area | All |
Mode Of Report | Soft Copy, Hard Copy |
The field /plant visit is the most important part of the Electrical Safety Audit program. This involves visiting the plant to identify electrical hazards as per the scope of the audit. In electrical safety audits, the incoming electrical supply receiving section (outdoor substation and main transformer) is inspected first.
Then the main sub-station housing the PCCs or MCCs and the cable gallery (if present) is inspected. Next are the electrical equipments installed in various process sections, the cabling and the distribution transformers located in the plant are visited. The aspects such as earthing, lightning protection, maintenance condition, loose cabling, temporary wiring, electrical fire hazards, shock potential, etc. are critically looked-into. The checklist provided in the ‘Pre-audit Preparation’ section is rather a comprehensive attempt, covering almost all-electrical safety aspects. <!-- /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Calibri","sans-serif"; mso-bidi-font-family:Mangal; mso-ansi-language:EN-IN; mso-fareast-language:EN-IN;} -->
Additional Information: